Project implementation location:Liangshan Port, Jining, Shandong
In September 2019, Huibo formally launched R&D cooperation on the intelligent train car cleaning robot system project with Jining Mining Group Logistics Co., Ltd.
In March 2020, the Huibo intelligent train car cleaning robot system was installed and debugged, and officially put into use on April 20.
In August 2020, Jining Mining Group Logistics Co., Ltd. purchased another Huibo intelligent train car cleaning robot, which was officially put into use on October 30 (enabling 1 worker to operate two intelligent cleaning robots simultaneously).
In July 2021, Jining Mining Group ordered 2 more Huibo intelligent train car cleaning robots.
In mid-January 2022, online debugging was completed, achieving joint operation of Lines 1 and 2.
Unloading Type: Return-type Double-tipping (2 sets)
Cleaning Cycle: 300 carriages/day
Cleaning Effect:
Manual cleaning residue: 20kg/carriage
Equipment cleaning residue: ≤5kg/carriage
Process: Cleaning ordinary dry coal
Car Cleaner Structure: Gantry-type (negative pressure cleaning)
Cost Savings:
Material cost: ≥1 million yuan/year
Labor cost: ≥1 million yuan/year
Operation Mode: One-button start, single-machine unmanned operation, multi-machine centralized monitoring
Commissioning Time:
April 20, 2020 (1 set); October 30, 2020 (1 set); mid-January 2022 (2 sets)
Delivery Status: Delivered